- County
- DuPage County
- Local places
- Old Town · Springfield Park
- Median housing year built
- 1981 CMAP · ACS 2020–2024 estimates
The early-1980s midpoint in the housing profile
CMAP reports a median housing construction year of 1981 for Bloomingdale. If your home dates from around that period, gather the history of later kitchen, bathroom or hallway updates before requesting a continuous new finish. Rooms renovated at different times may not share the same floor buildup. A photograph of each connection helps identify the questions to resolve at the measure. The aim is to establish where removal, preparation and transition work will occur, rather than assuming the original construction date describes every current surface.
A majority from the 1970–1989 building period
The 1970–1989 construction category accounts for 55.5% of Bloomingdale’s estimated housing units. For an interior from that era, focus on what previous owners changed, especially where doors were trimmed or flooring was laid over another covering.
These are items to investigate at your address, not conditions established by the municipal estimate. If you are retaining a stair or adjoining tiled room, include that edge in the photographs. Its finished height may shape the replacement detail as much as the preferred new material.
Larger buildings add delivery details to the flooring scope
An estimated 12.9% of Bloomingdale housing is in buildings of twenty or more units. In a building of that scale, ask the manager how flooring, tools and removed material should move through the property. Find out whether an elevator, shared hallway or designated entrance is involved before an installation date is promised. Those requirements vary by building. Include the answers with your room list so the written scope can address practical access, protection of retained common surfaces and the limits of work inside the dwelling.
Start with sheet or tile, then plan the cuts
Sheet vinyl and vinyl tile create different ordering and installation decisions. For a sheet product, room shape, roll width and pattern affect the cutting plan and whether a seam is needed. For tile, layout and the approved bonding system need review together. Send the exact product information with your room sketch rather than relying on the word vinyl alone. Include closets, alcoves and fixture positions so the measure can account for the full shape of the room and identify edges that need a deliberate finish.
A later building period can still contain original finishes
CMAP attributes 31.8% of Bloomingdale’s estimated housing to 1990–2009 construction. A floor from this period can be part of a larger original interior package, with cabinets, doors and stair trim designed around its height.
When replacing only the floor, show those retained elements together. Decide whether the new surface is intended to meet them as closely as practical or end at a deliberate transition. The scope should resolve that choice before ordering material, rather than leaving every edge to be decided during installation.
Old Town and Springfield Park frame different daily routines
Bloomingdale identifies Old Town at Lake Street and Bloomingdale Road as a collection of businesses in restored buildings, while Springfield Park is a separate public recreation destination. These are local reference points, not descriptions of the floor inside your property. For a nearby home or business, explain the entrance people actually use and the room that receives the heaviest traffic. A residential entry used after park visits and a customer-facing shop entrance deserve separate discussions about appearance, cleaning and how the installation can be sequenced.
The surface below the vinyl remains important
Thin resilient finishes can reveal irregularities beneath them, which makes preparation part of the installation assessment. Existing ridges, panel joints, loose areas and old adhesive need to be evaluated against the replacement system. The method cannot be selected solely from how smooth the visible covering appears. Your written quote should distinguish removal, compatible preparation and the proposed installation. If an existing material is not confidently identified, resolve its suitability for disturbance before removal proceeds. Findings exposed during work should be documented before any additional scope is approved.
Schedule seams, appliances and return to use
Agree on appliance movement and reconnection responsibilities before work begins. A new floor height can affect openings and clearances, and moving equipment back into place needs a protection plan. Sheet seams and edge treatments should follow the particular product rather than a generic installation assumption. Ask for the applicable timing for foot traffic, furniture, equipment and cleaning; those may be different milestones. Keeping the manufacturer’s instructions with the project documents makes it easier to understand when the room can resume its normal use without disturbing the new finish.


