- County
- McHenry County
- Local places
- Meadows of West Bay · Sunrise Ridge · Shore Hills · Stonewater
- Median housing year built
- 1970 CMAP · ACS 2020–2024 estimates
Meadows of West Bay and Sunrise Ridge locate different project settings
Village records identify Meadows of West Bay and Sunrise Ridge, along with Shore Hills and other Wonder Lake subdivisions. Use the correct subdivision name to orient a request, then provide the complete address and entrance for the actual work. Explain the room level and the surfaces you want to retain. A lakeside-area name cannot establish the build year, floor support or association requirements of an individual house. The measure should connect your proposed material with the property’s own layout and condition, using the local reference to locate rather than diagnose the project.
The midcentury estimate points toward questions about earlier updates
CMAP’s 2020–2024 housing estimates place 43.3% of Wonder Lake units in the 1940–1969 construction group. If that period fits your home, identify which rooms were changed later and where additions meet earlier construction.
A doorway or enclosed area may have a different assembly from the main interior, but that must be inspected rather than assumed. Photographs across those connections help the measure define what to investigate. The statistical period provides background for an established property; it does not establish the condition or composition of its current floor.
The 1990–2009 cohort may retain useful product records
The Wonder Lake profile estimates 35.6% of housing in the 1990–2009 construction period. For a home in that group, spare material, carton labels or records from a later remodel can help explain what remains in adjoining rooms. Bring those details if the new floor needs to connect to an existing finish. The connection may involve height and edge treatment as well as appearance. A broad construction category cannot identify the installed product, so the measure should use actual records and room conditions to develop the scope.
Assess the whole assembly under the tile
A tile floor depends on its supporting assembly as well as the visible ceramic or porcelain. The measure should identify the substrate, preparation needs and finished floor height before the setting system is finalized. Tile size, room use and the chosen materials affect the installation details. Provide the exact product name and dimensions if you already bought the tile. A written scope should make clear which preparation, underlayment or specified membrane is included, and how unexpected conditions beneath a removed finish will be reviewed before additional work proceeds.
Stonewater planning shows why a survey period is not the present inventory
Village meeting minutes from October 2025 discuss a further development phase at Stonewater. That is evidence of planning activity after the 2020–2024 period underlying the CMAP housing estimates; it is not proof that all proposed homes are complete.
For a newer property, provide the actual completion date, builder information and selected flooring records if available. Do not use a community median to assign an age to the house. The assessment needs the current room assembly and proposed product, whether the request concerns a recent build or an established interior.
Lake rights are separate from the way a household uses its entry
The MPOA’s documents connect its Wonder Lake area membership to properties with lake rights. If lake recreation is part of your household’s routine, describe how footwear and equipment move into the interior you want to update. That practical use can help frame preferences for cleaning and appearance. It does not establish a moisture problem in the building, and lake membership alone cannot choose a flooring system. The installation requirements must follow the selected product and measured room conditions while taking your actual daily use into account.
Lay out the sightlines and the connections
Pattern and joint decisions should be made before tile is set. Review the most visible entrance, the cuts at edges and how the new floor meets a retained surface. Large-format tile can make surface irregularities and alignment especially noticeable, so the product’s layout recommendations matter. Include grout selection and movement accommodation in the planning conversation. At a doorway, the combined thickness of tile, setting materials and any underlayment affects the transition. Resolve that connection in the scope rather than treating it as a last-minute trim choice.
Keep water management and curing in the scope
Grout alone does not define the water-management performance of a floor. Where the room calls for waterproofing, the specified assembly and its connections need to be addressed as a system. Ask which materials are being used and retain their instructions with the project records. The return-to-use plan should follow the actual mortar, grout and other installation products, including the room conditions they require. Furniture movement, ordinary traffic and cleaning should resume according to that guidance rather than an assumed universal timetable for every tile project.


